METHODICAL DIRECTION FOR PROJECTS PHASING
The methodical direction in question relates to the projects of priority axes 1 to 6 of the Operational Programme Transport, the implementation of which cannot be terminated due to its material and financial aspects in the programming period 2007 – 2013 as they meet the conditions for project phasing and can be finished in the programming period 2014 – 2020. The target of the methodological direction is to determine the procedure for the phasing of projects that will be implemented in two programming periods:
Related documents:
|
Managing Authority | Photo gallery | Main areas | References |
---|---|---|---|
Ministry of Transport and Construction of the Slovak Republic Námestie slobody č. 6 P.O.BOX 100, 810 05 Bratislava Phone: 02 5949 4111 |
![]() |
|
The Operational Programme Integrated Infrastructure is co-financed by the European Structural and Investment Funds | © 2017 MTC SR |
---|
Managing Authority: Ministry of Transport and Construction of the Slovak Republic Bratislava |
---|