METHODICAL DIRECTION FOR PROJECTS PHASING

The methodical direction in question relates to the projects of priority axes 1 to 6 of the Operational Programme Transport, the implementation of which cannot be terminated due to its material and financial aspects in the programming period 2007 – 2013 as they meet the conditions for project phasing and can be finished in the programming period 2014 – 2020.

The target of the methodological direction is to determine the procedure for the phasing of projects that will be implemented in two programming periods:

  • In the programming period 2007 – 2013 implementation of the first phase of the project in the Operational Programme Transport,
  • In the programming period 2014 – 2020 implementation of the second phase of the project in the Operational Programme Integrated Infrastructure.

Related documents:

Valid from Name File type   Valid until
17.02.2016 Usmernenie k fázovaniu projektov OPD/OPII, verzia 2.1 RAR [637 kB] Aktuálna
02.11.2015 Usmernenie k fázovaniu projektov OPD/OPII, verzia 2.0 RAR [1.2 MB] Ukončená 16.02.2016
22.08.2015 Usmernenie k fázovaniu projektov OPD/OPII, verzia 1.0 RAR [1.2 MB] Ukončená 01.11.2015







Managing Authority Photo gallery Main areas References
Ministry of Transport and Construction
of the Slovak Republic

Námestie slobody č. 6
P.O.BOX 100, 810 05 Bratislava

Phone: 02 5949 4111


Photo gallery


The Operational Programme Integrated Infrastructure is co-financed by the European Structural and Investment Funds© 2017 MTC SR
Managing Authority:
Ministry of Transport and Construction of the Slovak Republic
Bratislava